XB-52 Stratofortress Vista: Presentazione Mosaico Elenco 1 July 24, 2017
the cockpit insert for the new nose section has been cleaned up and checked for fit. The new tail piece framing was incomplete so has been sanded back and will be replaced later in the build,
2 July 24, 2017
The replacement nose has been cleaned up, some areas need filling which will be done when it is attached to the fuselage.
3 July 24, 2017
Another view of the new nose. This piece had an annoying casting lug on the nose that had to be removed and sanded to shape.
4 July 24, 2017
The kit nose has been removed so the prototype tandem cockpit nose can be fitted.
5 July 24, 2017
One half of the fuselage was marked at the appropriate place and a razor saw was used to remove the nose and tail. the fuselage halves were then taped together and then the nose and tail were removed form the other half.
6 July 24, 2017
The tail end after the removal "D" tail.
7 July 24, 2017
The pieces that have been removed.
8 July 24, 2017
The bomb bay doors were then glued in place and a piece of plasticard was glued in to provide support for the filler that was needed to fair them in.
9 July 24, 2017
Filler added to fair in the bomb bay doors in the closed position.
10 July 24, 2017
The doors after sanding, The panel lines will be restored later.
11 July 24, 2017
The "D" model has a slot for the bomb racks or the slipper fitting used when the racks are not fitted, As these were not present on the prototype these need to be covered.
12 July 24, 2017
The slipper fitting supplied in the kit was used as a template on plasticard. This was then cut out and then sanded to shape and size.
13 July 24, 2017
This shows one of the blanking pieces sanded to shape next to the other one.
14 July 24, 2017
The blanking piece was glued into place and left to cure before sanding flush.
15 August 2, 2017
and for the other wing.
16 August 2, 2017
The flaps on the real thing.
17 August 2, 2017
Another view of the B-52's flaps.
18 August 2, 2017
and a third.
19 August 2, 2017
As you can see the kit flaps show a number of differences with the real flaps.
20 August 2, 2017
To correct this plasticard was cut and and glued to the flap. this was then sanded to shape and marked up for the recesses for the actuators and guides.
21 August 2, 2017
The recesses were cut out using a scriber and a modelling knife.
22 August 2, 2017
The shorter recesses are shallower than the others, these correspond to the guides rather than the actuators.
23 August 2, 2017
Sink marks filled and sanded on the flaps reverse.
24 August 2, 2017
Marking out and cutting bulkheads to box in the landing gear bays.
25 August 2, 2017
The bulkheads in place on the rear bays.
26 August 2, 2017
and on the forward bays. A small amount of filling is still required to make them flush.
27 August 17, 2017
Starting to fill the slots for the additional fuel tanks.
28 August 17, 2017
more on filling the slots for the underwing fuel tanks
Commenti 25 November 2024, 07:54 -
Album info Converting the Monogram B-52D to the XB-52 Prototype.
28 immagini
1:72
In corso
Tutti gli album Visualizza tutti gli album »