Scalemates Schwalbe Group build 2021
Ready to go
Decals from japo
The subject of this build
Or kagero
First layers of rlm 66
Seatbelts added from the sparesbox
Seatbelts added from the sparesbox
Painted and ready for installing, looks terrible in the picture, yet not as bad in real life
Kit dash with kit decals, good enough for this scale
Added some details to the rear of the cockpit.
Cockpit tub closed
Inside painted aluminium
Good fit all 'round, little need for filler. I added a small strip of styrene to represent the metal strip between the gun doors, will sand this back later.
Good fit all 'round, little need for filler
Ring pulls added to the starters
In order to improve the fit of the upper wings remove all knock out tabs inside.
Added some details to the rear of the cockpit.
Added some details to the rear of the cockpit.
Cutting the ribs on the lower wing will help improve the fit of the engine nacelles, yet filler will be needed to blend them in. The fit is never good on any kit of the me 262 I've build, except for the tamiya kit maybe, but this will eventually be acceptable.
Blending the nacelles, with a big blob of filler 🙁
Blending the nacelles, with a big blob of filler 🙁
After sanding it isn't that bad, altough I'm not too pleased with the right nacelle, will put some paint on it tomorrow as a final check
About ready to paint🙂
Canopy masked and fitted, almost ready to paint
Basic paint has been aplied
Basic paint has been aplied
Basic paint has been aplied
Painted the replacement nose a different colour
Painted the replacement nose a different colour
First camouflage aplied
Camouflage ready for decals
Camouflage ready for decals
Camouflage ready for decals
Camouflage ready for decals
Reichs defence band included in the kit disintegrated when I tried to place them on the model 🙁
Lucky for me, I had a printscale sheet in my stash
Reichs defence band aplied🙂
Most of the decals aplied to the top.
Most of the decals aplied to the top.
Added the decals to the lower end, and started on those little stencils
Underside washed with Mig neutral wash
Siscorlink added from the sparesbox
Up on its feet, and the antenna wire fixed ( needs to dry before it gets cut)
I'm calling it done
I'm calling it done
I'm calling it done
I'm calling it done
Added to the collection 🙂
Komentarzy
8 October 2024, 01:36 -
Project info
Group Build
Scalemates Schwalbe Group build 2021
1. Styczeń do 31. Grudzień 2021
1. Styczeń do 31. Grudzień 2021