rc modeling database | manager de rezervă
knubbels
knubbels
CH

2022-01-30, cockpit cleanup and PE

Comentarii

30 November 2024, 01:01 -

Album info

I tried 3x variations of the RLM66 to this stage.
Also I found the port side plastic details a bit thick and located to high/near the canopy frame and removed them.
Also added the wiring on the starboard cabin hull.
Scratch built from 0.5mm copper wire soldered at the root of the "fork".

48 imagini
1:72
Queued
1:72 He219A-0 Uhu (Dragon 5005)1:72 He 219 Uhu - wheels set (ResKit RS72-0307)1:72 He 219A-0 Uhu - pre-cut painting masks (ResKit RSM72-0006)1:72 German Radar FuG 220 "Lichtenstein SN-2" (Master AM-72-016)1:72 He 219 Uhu (Eduard 73670)

Toate albumele

Vizualizați toate albumele »